Fugro wins contract with Galsi to define gas pipeline route from Algeria to Italy
2007.10.19 -
Contracts
Fugro has been awarded a contract to perform a detailed marine survey in the Mediterranean Sea to select the best route for the GALSI gas pipeline from Algeria to Southern Sardinia and then from Northern Sardinia to the mainland of Italy. The contract value is approximately EUR 18 million. The project will start immediately and is expected to last till April 2008 for the fulfilment of the marine survey and to conclude by the end of July 2008 with the release of the Final Report.
Fugro will manage the whole detailed marine survey project, which will involve geophysical and hydrographical survey with its vessel ‘Geo Prospector’ and the use of an AUV (Autonomous Underwater Vehicle), as well as offshore seabed geotechnical investigations by two vessels, including Fugro’s vessel ‘Bucentaur’. The project also involves near shore survey for the four landfalls. The length of the route is 529 kilometres of pipeline in water depths down to 2,850 metres.
Client is Galsi S.p.A., a joint venture consisting of the companies Sonatrach, Edison, Enel, Wintershall, Hera and the Sardinian company Sfirs.
Due to the broad scope of the project nine of Fugro’s specialised operating companies will be involved.
Cameron (NYSE: CAM) has signed a three-year worldwide preferred supplier agreement with Schlumberger Integrated Project Management (IPM) for the supply of a wide range of flow equipment products and services. As part of the agreement, Cameron will provide Schlumberger IPM with all surface, subsea, drilling, measurement, compression and downstream equipment on a worldwide basis.
ClampOn has been awarded a contract for delivery of five subsea ClampOn DSP Leak Monitors to the Tampen Link project in the Norwegian sector in the North Sea (Sept 07). ClampOn will supply its ultrasonic non-intrusive acoustic Leak Monitors to Technip Norge AS on behalf of Statoil. The Leak Monitors will be retrofitted on two 20” gas valves on the seabed to verify/disprove through-valve gas leakage. These valves are currently open and they will be shut to close off the bypass alternative.
Helix Energy Solutions (NYSE: HLX) announced today that it has received a Letter of Intent ("LOI") for the installation of the subsea infrastructure for the VIC/P44 Stage 2 Development project in the Otway Basin offshore Australia. Participants in the VIC/P44 permit are Santos Limited (Operator) 50%, Peedamullah Petroleum Pty Ltd (Australian Worldwide Exploration) 25% and Mitsui E&P Australia Pty Ltd. 25%.
Velosi Limited Velosi or the Group, a provider of asset integrity and HSE services to a number of major national and multinational oil and gas companies, is pleased to announce that it has been re-awarded a contract from Mobil Producing Nigeria, for the next three years with an option to extend for a further one year.